Existing Stock Transformer to Connector Long Leads @ Blowout Pricing (While Supplies Last)

SKU: EZPNPxxTRANSCONN
(22 customer reviews)

Starting At: $17.38 USD

Save now with blowout pricing on these existing single wire cables while supplies last. Blowout cables are non-returnable/final sale.

Our transconnect cables are perfect for running power from your transformer to your lighting. Available in lengths from 20 ft – 60 ft so no matter your lighting setup, we have a connector cable to fit your needs.

DEKOR® Lighting is transitioning to new and improved wiring, replacing clear (single wire) with black heavy duty (2-wire). We carefully designed this new system to be backwards compatible with our current clear wire cables.

Want to buy the new cables? Click Here

Clear

Additional information

Weight0.7 lbs
Dimensions8 × 4 × 3 in
Waterproof

Yes

22 reviews for Existing Stock Transformer to Connector Long Leads @ Blowout Pricing (While Supplies Last)

  1. Bret S. (verified owner)

  2. Forrest (verified owner)

    Good product but shipping very expensive

  3. Al F. (verified owner)

  4. Eric Sanders (verified owner)

    Great product

  5. Garnet M. (verified owner)

    All pieces integrated easily together and with next generation LED’s provide a nice lighting package.

  6. Kyle DePasquale (verified owner)

  7. Michael D. (verified owner)

  8. Christopher J. (verified owner)

  9. Jason J. (verified owner)

  10. Riley Keaton (verified owner)

  11. Anonymous (verified owner)

  12. Jesse W. (verified owner)

    Worked great for our application…easy plug and play!

  13. Linda D. (verified owner)

  14. Darrell Kinchelow (verified owner)

    So far so good

  15. JOHN ANGIULO (verified owner)

  16. Douglas (verified owner)

    Great system – used to repair damage done by pavers

  17. john h. (verified owner)

  18. Mike A. (verified owner)

    Plug and play wiring is great.

  19. Cletus Breeding (verified owner)

  20. Parisa Alavi (verified owner)

  21. Frederick Schutte (verified owner)

  22. Steven Chizzoniti (verified owner)

  23. thomas sheen (verified owner)

  24. Joseph B. (verified owner)

    works

  25. Lori (verified owner)

    Great product. Would be nice if they came in shorter length options.

Only logged in customers who have purchased this product may leave a review.

Click here for most current information: WARRANTY POLICY.